Installing event tentage safely takes trained crew who understand anchoring, load distribution, and how to read a site before the first pole goes up. A typical crew of 4-8 works with aluminium frames, weighted bases for concrete surfaces, and proper ground anchors for soft ground — always following BCA guidelines for temporary structures. It’s physical, technical work that looks simple from the outside but isn’t.
Crews follow BCA’s temporary structure guidelines, which cover wind load calculations, anchoring requirements, and structural limits for different tent sizes and configurations. SCDF fire safety requirements also factor in for larger events, particularly around clear egress paths and material fire ratings.
The most common mistake we see from less experienced crews is under-anchoring on concrete surfaces, assuming weighted bases alone are enough without accounting for wind exposure at a particular site. Void decks with wind tunnel effects between blocks need extra consideration that only comes with experience.
| Skill area | Why it matters |
|---|---|
| Structural assembly | Correct load distribution prevents frame failure under wind or weight |
| Anchoring for different surfaces | Concrete, soil, and decking each need different securing methods |
| Electrical basics | Safe power distribution for lighting and equipment |
| Weather judgment | Knowing when to pause work for lightning or high wind |
| Site coordination | Working around other vendors, tight access, and time pressure |
An experienced crew adapts on the spot — repositioning anchors for uneven ground, adjusting for unexpected obstacles, or catching a structural issue before it becomes a problem during the event itself. This judgment comes from years of hands-on work, not just following a manual.
Crews who’ve worked together for years also move faster and more safely as a team, since they anticipate each other’s next steps without needing constant direction. This matters most on tight timelines or complex sites where miscommunication costs real time.
Typically 4-6 for a 100-pax event, scaling up to 15-20 for large multi-section setups above 500 pax.
There’s no single blanket certification, but crews should be trained in BCA temporary structure guidelines and, for larger jobs, coordinate with certified professionals for structural sign-off where required.
Based on ground type (concrete, soil, decking), tent size, and site-specific wind exposure, assessed during the initial site walk.
Work pauses until it’s resolved — whether that’s re-anchoring, adjusting the layout, or in rare cases, recommending a change to the planned tent size or configuration.
This varies by supplier and event scale, but it’s a reasonable question to raise during the quotation stage if it matters to you.
Crew members often describe the job as physically demanding but genuinely satisfying — there’s a clear, visible result at the end of every shift, whether it’s a void deck wake set up within hours or a large corporate gala taking shape overnight. Long hours during peak season (Nov-Jan) are the hardest part, with back-to-back setups and early starts across weeks of heavy demand.
Weather is a constant companion in this line of work. Crews develop an instinct for reading the sky, knowing when a passing shower won’t affect setup and when it’s time to pause for safety, particularly around lightning risk during exposed frame and electrical work.
Learn more about our crew and how we approach every setup, or browse examples of completed projects.